Electro Stimulation Ward > Signals and Noise

voltage and current burn in

<< < (2/2)

tmazz:

--- Quote from: Emil on May 17, 2022, 04:53:40 AM ---ATTENTION CABLE MANUFACTURERS!!!!

BURN IN THE CABLES FOR YOUR CUSTOMERS :duh

Ridiculous that this needs to be done by the consumer.

Rant over :lol:

--- End quote ---

Stop  ](*,)  You just need to buy from the right cable company.   :D

From the Triode Wire Labs web site:

"All cords are “burned-in” at TWL, featuring a BRAND NEW audiodharma CABLE COOKER™ HIGH POWER Anniversary Edition 3.5 with premium all-copper billet Cardas CCGR binding posts. Only Three in the World & Triode Wire Labs has one!"

P.I.:

--- Quote from: tmazz on May 17, 2022, 03:56:12 PM ---
--- Quote from: Emil on May 17, 2022, 04:53:40 AM ---ATTENTION CABLE MANUFACTURERS!!!!

BURN IN THE CABLES FOR YOUR CUSTOMERS :duh

Ridiculous that this needs to be done by the consumer.

Rant over :lol:

--- End quote ---
:thumb:

Stop  ](*,)  You just need to buy from the right cable company.   :D

From the Triode Wire Labs web site:

"All cords are “burned-in” at TWL, featuring a BRAND NEW audiodharma CABLE COOKER™ HIGH POWER Anniversary Edition 3.5 with premium all-copper billet Cardas CCGR binding posts. Only Three in the World & Triode Wire Labs has one!"

--- End quote ---

rollo:
  Agree Cable Manf should burn in 100%. Some cables were over 500 hours to stop changing. Do not get me going with Rhodium plugs and receptacles. Torture but when done worth the pain.

charles

P.I.:

--- Quote from: rollo on May 20, 2022, 09:55:31 AM ---  Agree Cable Manf should burn in 100%. Some cables were over 500 hours to stop changing. Do not get me going with Rhodium plugs and receptacles. Torture but when done worth the pain.

charles

--- End quote ---
Companies that sell large volumes of cables will be hard pressed to do this. Smaller companies like TWL and me (in the past... and sometimes now) do this. 

When I get a batch of wire in I find the destination end of the spool and hook it up to a load and burn the whole spool for about a week.  Then, when I build the cable(s) I burn them for a couple of days, typically.

My burn-in device is a 3A 48V transformer with a variac controlling the voltage that has a random noise generator hooked up to the whole thing that cycles from 2Hz > a couple of GHz that was an inexpensive buy from eBay and it works well.  The 3A @ 48V transformer really doe the job on power cables and speaker cables.  I have switchable loads from 1 ohm to 500K ohms.

I can also run this puppy hooked up to wire when I cryo it  :thumb:  That method takes 3 days...

I have a batch of wire hooked up to it as I type.

OCD at it's best.  I'm so me...

Navigation

[0] Message Index

[*] Previous page

Go to full version